Hetton Colliery Chaldron Pack
SKU: 87079496712

Hetton Colliery Chaldron Pack

Sale price$45.90 Regular price$51.00
Save 10%

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jul 9 - Jul 14

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Hetton Colliery Chaldron PackThree wagon multi pack, NER 4T Chaldron Pack B: Hetton Colliery Railway Three ex NER P1 style Chaldrons in pre 1911 lettering. Built by George Stephenson, Hetton Colliery Railway celebrates its 200th anniversary in 2022, being the worlds first complete railway system that only utilised steam locomotives. Containing three wagons, numbered: 1518 211 1349 Each pack produced has been themed by colliery, and each waggon depicted is based on photographic

Three wagon multi-pack, NER 4T Chaldron

Pack B: Hetton Colliery Railway - Three ex-NER P1 style Chaldrons in pre-1911 lettering. Built by George Stephenson, Hetton Colliery Railway celebrates its 200th anniversary in 2022, being the world’s first complete railway system that only utilised steam locomotives.

Containing three wagons, numbered:

  • 1518
  • 211
  • 1349

Each pack produced has been themed by colliery, and each waggon depicted is based on photographic evidence and reference to colliery records to confirm lettering styles. Some packs contain just one style of waggon, while others contain mixed styles where research has shown that they operated in conjunction with each other. 

Specification List:

  • Die-cast metal chassis with plastic body. Weight of 9g unloaded.
  • Operates over minimum radius curves (371mm, 1st radius set-track)
  • Five different body designs, covering a time period from 1840 to 1978.
  • Three styles of wheel design; split spoke, star spoke and wave spoke, to a blackened 00 gauge RP25-88 profile.
  • Three styles of braking arrangement and brake handles, with different block types and the more complicated Londonderry clasp type brake.
  • Three arrangements of ‘bang-boards’.
  • Additional, removable ‘greedy boards’ (horizontal board extensions to the body) to the Shildon Works built Chaldron, giving an increased coal loading.
  • Scale width wire handrails, metal pin jaw coupling and wire/etch handbrake levers.
  • Eroded metal/plastic detail parts, including grab handles, door securing pins, chassis chain points and safety chains in metal.
  • Wagons connected via an all new link fine chain with Neodymium magnetic heads, connected at the wagon via prototypical cotter pin coupling.
  • Two extra NEM fitted magnetic couplings supplied with wagon packs to allow for fitting to locomotives and/or additional rolling stock.
  • Artwork features authentic colliery markings and numbers, accurate to time period modelled and based on actual photographic evidence where possible.
  • Additional research assistance provided by Beamish Living Museum, Bowes Railway and the North Eastern Railway Association.
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 87079496712

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.2 ★★★★★
Based on 412 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
O
Verified Purchase
Owen Shirk
Waukegan, US
★★★★★ 5
OEM is always the answer
No reason not to go OEM for this! Came with every possible gasket and seal I could need. Specifically for my Alpha One Gen 1 it took maybe 25-30 min to completely install. While you’re there check the base plate for wear and the other surrounding items like your water tube. Rather keep the lower unit off for an extra day to get another part than a catastrophic failure.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 9, 2025
T
Verified Purchase
Taylor 🤍
Draper, US
★★★★★ 5
Husbands things
My husband bought this. I don’t know much about it but he has zero complaints. He bought it for a boat. He has fixed up 2 boats, sold one & we kept the other. So he apparently knows what to buy & how to use it.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on November 6, 2025
E
Verified Purchase
Edward W.
Whiting, US
★★★★★ 4
Amazon is easy and fast . No problems the oarts was exactly as described.
liked that everything was in one bag . and could make sure everything was changed .
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on August 3, 2020
J
Verified Purchase
Justin Yeager
Boise, US
★★★★★ 5
Stay cool
Just what I needed, super fast shipping
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on October 19, 2025
C
Verified Purchase
Crimson
Grantham, US
★★★★★ 5
Outboard is Cooling
The repair kit arrived on time as scheduled. The kit contained everything needed to replace the Mercury 175 OptiMax impeller. The engine is cooling now and we are back on the water without issue. Easy replacement.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on July 5, 2023

recommand products