
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 9 - Jul 14
For Your Every Summer RSVP, with Code: SUMMER15
Description
Post Mix Concrete 20kgRemix Post Mix Concrete is suitable for use in fixing all types of wooden, metal and concrete posts. Applications Remix Post Mix Concrete is suitable for use in fixing all types of wooden, metal and concrete posts. Quality The mix is a kiln dried, pre blended, factory produced quick setting concrete, which hardens in approximately 10 minutes after water addition, depending on ambient conditions. Post Shape & Size Hole Size (Width x Depth) Approx
Remix Post Mix Concrete is suitable for use in fixing all types of wooden, metal and concrete posts.
Applications
Remix Post Mix Concrete is suitable for use in fixing all types of wooden, metal and concrete posts.
Quality
The mix is a kiln dried, pre-blended, factory-produced quick setting concrete, which hardens in approximately 10 minutes after water addition, depending on ambient conditions.
| Post Shape & Size | Hole Size (Width x Depth) | Approx number of bags required |
|---|---|---|
| Round 2" (50mm) |
6" (150mm) x 12" (300mm) 6" (150mm) x 18" (450mm) 6" (150mm) x 24" (600mm) 8" (200mm) x 12" (300mm) 8" (200mm) x 18" (450mm) 8" (200mm) x 24" (600mm) |
1/2 Bag 1/2 Bag 3/4 Bag 2/3 Bag 1 Bag 1 1/2 Bags |
| Square 3" (75mm) |
8" (200mm) x 18" (450mm) 8" (200mm) x 24" (600mm) 8" (200mm) x 30" (750mm) 12" (300mm) x 18" (450mm) 12" (300mm) x 24" (600mm) 12" (300mm) x 30" (750mm) |
3/4 Bag 1 Bag 1 1/3 Bag 2 1/4 3 Bags 3 3/4 Bags |
| Square 4" (100mm) |
8" (200mm) x 18" (450mm) 8" (200mm) x 24" (600mm) 8" (200mm) x 30" (750mm) 12" (300mm) x 18" (450mm) 12" (300mm) x 24" (600mm) 12" (300mm) x 30" (750mm) |
2/3 Bag 3/4 Bag 1 Bags 2 Bags 2 3/4 Bags 3 1/2 Bags |
User Instructions
Dig a hole to required size for post, half fill the hole with water and place the post in the hole.
The material is already pre-mixed. There is no need for mixing. It can simply be emptied straight from the bag into the hole.
Add the Remix Post Mix Concrete uniformly around the post, until it is above the level of water. If any dry powder remains visible at this stage, add additional water until absorbed by the material.
Adjust the post into position and support appropriately until material set occurs, after approximately 10 minutes.
After Laying
Once concrete has set, cover with earth, grass or decorative aggregate, as required.
Coverage
For help in calculating required quantities relevant to individual requirements, please consult the above table.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy